SIMULATION - Commissioning of Storage Tank Training Facility
13.10.2017
- 11m diameter x 13m high
- 400 square metres of fuel spill
- Rim seal fire scenario
- Centre roof fire scenario
- Ruptured tank wall / split flange scenario
- Kerosene Fuel or LPG Gas
- Foam Pourer System
- Tank Water Cooling System
- PLC HMI Touch Screen Control from Main Observation Tower, Satellite Control Panel and Operator Wireless Pendant Controls
- Full electronic fire ignition system
For any further information regarding this facility or for any assistance with any of your future fire training facility requirements please contact us at any time.
Alpine Metal Tech UK Ltd.
Safety Division - SIMULATION
The Maltsters, Wetmore Road
Burton upon Trent
Staffordshire, DE14 1LS
United Kingdom
Email: info-sim@alpinemetaltech.com